Westwater Kellyton Graphite Plant
Westwater Resources' battery-grade natural graphite plant at Kellyton in Coosa County, Alabama, designed to process natural flake graphite into coated spherical purified graphite (CSPG), with 12,500 t/year targeted in Phase I. Phase I construction has continued at a measured pace, with approximately $130 million of the $245 million Phase I cost estimate incurred through June 30, 2026, while an on-site R&D lab and qualification line operate and have produced more than one tonne of CSPG samples in aggregate. In August 2026 Westwater received EXIM approval for an approximately $25 million direct loan under the Make More in America Initiative; because closing remains subject to definitive documentation and customary conditions, the approval is recorded as a claim rather than as a lifecycle financing event, and the Phase I line's current state remains under construction. Both prior commercial agreements have been terminated by their counterparties (FCA in November 2025, SK On in March 2026).
Location: Kellyton, Alabama, United States
Phase I CSPG plant (under construction)
Under construction
Phase I of the Kellyton Graphite Plant, designed to process natural flake graphite into coated spherical purified graphite (CSPG) primarily for lithium-ion batteries; construction continuing at a measured pace with long-lead equipment on order. Westwater's filings do not separately describe the purification and spheronization unit operations, so no separate purification or particle-processing lines are recorded.
Material flow
Natural graphite concentrate → Coated spherical purified graphite (CSPG)
Capacity
12,500 t/year · Product mass · Target · as of Jun 30, 2026
Qualification
R&D lab and CSPG qualification line
On-site R&D laboratory and qualification line producing CSPG samples representative of future commercial material, in one to ten tonne batches, for customer pre-production evaluation, in-house quality control and operator training
Material flow
Natural graphite concentrate → Coated spherical purified graphite (CSPG)
Capacity
Qualification
Sources
- Westwater Resources, Inc. (SEC Form 10-Q for the quarter ended June 30, 2026) · published Aug 10, 2026 · retrieved Aug 12, 2026 · archive unavailable: Wayback verification blocked by archive.org outage on 2026-08-12; recheck on a weekly pass
- Export-Import Bank of the United States · published Aug 7, 2026 · retrieved Aug 12, 2026 · archive unavailable: Wayback verification blocked by archive.org outage on 2026-08-12; recheck on a weekly pass
- Westwater Resources, Inc. · published Aug 12, 2026 · retrieved Aug 12, 2026 · archive unavailable: Wayback verification blocked by archive.org outage on 2026-08-12; recheck on a weekly pass
- U.S. Geological Survey, Mineral Commodity Summaries 2025 · published Jan 31, 2025 · retrieved Aug 12, 2026 · archive unavailable: Wayback verification blocked by archive.org outage on 2026-08-12; recheck on a weekly pass