Kilbourne Graphite Purification Plant, Anniston Army Depot

Empire State Mines, LLC, a wholly owned subsidiary of Titan Mining Corporation, received a conditional Enhanced Use Lease selection from the U.S. Army on June 25, 2026 for approximately 97 acres (Parcel 1) at Anniston Army Depot, Alabama — the secondary site for its Kilbourne Graphite Purification Plant, advancing on a sequenced schedule behind the primary site at Pine Bluff Arsenal, Arkansas. The plant is to produce Purified Micronized Graphite (PMG) and Coated Spherical Purified Graphite (CSPG) from 100% domestic feedstock under Army RFP No. DACA27-1-26-204 and the Army's Strategic Capital Initiatives program, using 10 U.S.C. 2667 Enhanced Use Lease authority for a term of up to 50 years. Formal lease agreements and Business Terms Agreements are in negotiation, construction is targeted to commence in the second half of 2027, and no construction may begin until NEPA and other environmental and regulatory reviews are complete. No capacity figures and no Anniston-specific process description have been published on any source loaded this pass; both lines are recorded as announced and neither Titan nor the Army states which products will be made at which of the two sites.

Facts on this page last re-verified Aug 12, 2026 — the oldest verification date among its current claims. How we verify.

Location: Anniston, Alabama, United States

Purification

Kilbourne purification circuit, secondary site (conditionally leased)

Announced

Purification circuit of the planned Kilbourne Graphite Purification Plant on approximately 97 acres (Parcel 1) at Anniston Army Depot, the designated secondary site advancing on a sequenced schedule, producing Purified Micronized Graphite (PMG) from 100% domestic natural flake graphite feedstock anchored by Titan's Kilbourne resource in New York State. PMG is purified and micronized rather than spheronized; the atlas's purified-flake-graphite token is the closest vocabulary match and the output assignment is recorded as inferred.

Material flow

Natural graphite concentrate → Purified flake graphite

Capacity

No capacity claim. Absence of a figure means no source publishes one.

Qualification

No qualification claim. Status does not imply qualified output.

Anode finishing

Kilbourne CSPG finishing, secondary site (conditionally leased)

Announced

Coated Spherical Purified Graphite production within the planned Kilbourne Graphite Purification Plant scope at Anniston Army Depot, described by the Army as the essential anode material for high-performance lithium-ion batteries powering unmanned aerial platforms, dismounted soldier electronics and hybrid-electric tactical vehicles. Neither source describes a separate spheronization step or allocates products between the two conditionally leased sites.

Material flow

Purified flake graphite → Coated spherical purified graphite (CSPG)

Capacity

No capacity claim. Absence of a figure means no source publishes one.

Qualification

No qualification claim. Status does not imply qualified output.