Facility

Talga Luleå Anode Refinery and EVA Qualification Plant

Talga Group's natural-graphite anode operations at Luleå, Sweden: the operating EVA (Electric Vehicle Anode) qualification plant, producing 50 t/year of Talnode-C anode material from Vittangi trial-mining ore since 2022, and the planned commercial anode refinery, in FEED for a first 5,000 t/year commercial anode line with FID and targeted commercial output in 2027-28. The integrated Vittangi Anode Project holds a EUR 70 million EU Innovation Fund grant (project TalnodeONE) and a EUR 150 million EIB board-approved debt facility (currently undrawn); the refinery holds Strategic Project status under the EU Net-Zero Industry Act, while the Commission's first CRMA Strategic Projects list carries the related 'Talga Natural Graphite ONE' extraction entry. The refinery's three transformations (purification, particle shaping, coating) are recorded as separate planned lines; the intermediate material split is inferred from Talga's description of its purification, shaping and coating technologies. An earlier-reported 19,500 t/year full-project capacity figure was not confirmed on any source loaded this pass and is omitted.

Facts on this page last re-verified Aug 12, 2026 — the oldest verification date among its current claims. How we verify.

Location: Luleå, Norrbotten, Sweden

Anode finishing

EVA qualification pilot plant

Operating

Pilot-scale production of Talnode-C coated natural graphite anode material for customer qualification, using stockpiled ore extracted from the Vittangi mine during trial mining; applies Talga's proprietary purification, shaping and coating technologies at pilot scale

Material flow

Natural graphite concentrate → Coated spherical purified graphite (CSPG)

Capacity

50 t/year · Product mass · Nameplate · as of Aug 12, 2026

Qualification

No qualification claim. Status does not imply qualified output.

Purification

Anode refinery purification (planned)

Announced

Talga proprietary graphite purification technology; first stage of the planned commercial anode refinery processing Nunasvaara South graphite (pre-FID, in FEED as of April 2026)

Material flow

Natural graphite concentrate → Purified flake graphite

Capacity

No capacity claim. Absence of a figure means no source publishes one.

Qualification

No qualification claim. Status does not imply qualified output.

Particle processing

Anode refinery particle shaping (planned)

Announced

Talga proprietary graphite shaping technology; intermediate stage of the planned commercial anode refinery (pre-FID, in FEED as of April 2026); intermediate material split inferred from Talga's stated purification, shaping and coating capabilities

Material flow

Purified flake graphite → Uncoated spherical graphite

Capacity

No capacity claim. Absence of a figure means no source publishes one.

Qualification

No qualification claim. Status does not imply qualified output.

Anode finishing

Anode refinery coating and finishing (planned)

Announced

Talga proprietary coating technology producing premium natural graphite anodes for fast-charge, high-power lithium-ion battery applications; final stage of the planned 5,000 tpa first commercial anode line (pre-FID, in FEED as of April 2026)

Material flow

Uncoated spherical graphite → Coated spherical purified graphite (CSPG)

Capacity

5,000 t/year · Product mass · Target · as of Apr 21, 2026

Qualification

No qualification claim. Status does not imply qualified output.