Facility

Sal de Oro Lithium Carbonate Line

Primary-source record for Sal de Oro Lithium Carbonate Line. The qualifying line is modeled at the physical grain supported by the cited source, with lithium-brine as input and technical-grade-lithium-carbonate as output. Current state was rechecked for the Phase 2 launch-date sweep on 2026-08-18.

Facts on this page last re-verified Aug 18, 2026 — the oldest verification date among its current claims. How we verify.

Location: Salar del Hombre Muerto, Catamarca-Salta, Argentina

Lithium chemicals

Sal de Oro Lithium Carbonate Line qualifying line

Under construction

Brine processing and lithium carbonate conversion

Material flow

Lithium-Bearing Brine → Technical-Grade Lithium Carbonate

Capacity

No capacity claim. Absence of a figure means no source publishes one.

Qualification

No qualification claim. Status does not imply qualified output.

Sources