Sal de Los Angeles Lithium Project

Primary-source record for Sal de Los Angeles Lithium Project. The qualifying line is modeled at the physical grain supported by the cited source, with lithium-brine as input and technical-grade-lithium-carbonate as output. Current state was rechecked for the Phase 2 launch-date sweep on 2026-08-18.

Facts on this page last re-verified Aug 18, 2026 — the oldest verification date among its current claims. How we verify.

Location: Salar de Diablillos, Salta, Argentina

Lithium chemicals

Sal de Los Angeles Lithium Project qualifying line

Under construction

Brine recovery and conversion to lithium carbonate

Material flow

Lithium-Bearing Brine → Technical-Grade Lithium Carbonate

Capacity

No capacity claim. Absence of a figure means no source publishes one.

Qualification

No qualification claim. Status does not imply qualified output.