Facility
Rio Tinto Rincon Battery-Grade Lithium Carbonate Project
Primary-source record for Rio Tinto Rincon Battery-Grade Lithium Carbonate Project. The qualifying line is modeled at the physical grain supported by the cited source, with lithium-brine as input and battery-grade-lithium-carbonate as output. Current state was rechecked for the Phase 2 launch-date sweep on 2026-08-18.
Location: Salar del Rincon, Salta, Argentina
Lithium chemicals
Rio Tinto Rincon Battery-Grade Lithium Carbonate Project qualifying line
Under construction
Direct lithium extraction and conversion to battery-grade lithium carbonate
Material flow
Lithium-Bearing Brine → Battery-Grade Lithium Carbonate
Capacity
53,000 metric-tonne-per-year · Product mass · Nameplate · as of Jun 3, 2025
Qualification
Commercial production · The cited primary source identifies the line output as battery grade or battery quality. · Jun 3, 2025
Sources
- Argentina Ministry of Economy · published Jun 3, 2025 · retrieved Aug 18, 2026 · archive unavailable: Wayback /web/2026/ redirect probe returned HTTP 404 on 2026-08-19; no snapshot was verified.