Renascor Siviour Graphite Mine and Concentrator
Renascor Resources' planned open-pit graphite mine and flotation concentrator at Siviour, near Arno Bay on South Australia's Eyre Peninsula — the upstream half of the company's vertically integrated Battery Anode Material project, whose downstream Purified Spherical Graphite facility is planned for Bolivar. Export Finance Australia holds a conditionally approved A$185 million loan facility under the Australian Government's Critical Minerals Facility, first directed by the Minister on 1 February 2022 and re-announced on 17 April 2024 to bring Stage One forward. The mine is permitted (Mining Lease April 2019, PEPR November 2022) and has completed an early contractor involvement process, but no loaded source records the start of construction, so the line is left at its financed state. Renascor's Definitive Feasibility Study concentrate tonnages were not on any source loaded this pass and no capacity claim is recorded.
Location: Arno Bay, South Australia, Australia
Siviour open-pit mine and flotation concentrator (planned)
Financed
Conventional open-pit mine with a crush, grind, float processing circuit producing flake graphite concentrate for Renascor's downstream Purified Spherical Graphite operation; permitted under a Mining Lease granted April 2019 and a PEPR approved November 2022, with the early contractor involvement process for the mineral processing plant and non-processing infrastructure completed and optimisation workstreams under way
Material flow
→ Natural graphite concentrate, Natural graphite concentrate
Capacity
Qualification
Sources
- Export Finance Australia · published Apr 17, 2024 · retrieved Aug 12, 2026 · archive unavailable: Wayback verification blocked by archive.org outage on 2026-08-12; recheck on a weekly pass
- Export Finance Australia (Annual Report 2021–2022) · published Oct 27, 2022 · retrieved Aug 12, 2026 · archive unavailable: Wayback verification blocked by archive.org outage on 2026-08-12; recheck on a weekly pass
- Renascor Resources Limited · published Aug 12, 2026 · retrieved Aug 12, 2026 · archive unavailable: Wayback verification blocked by archive.org outage on 2026-08-12; recheck on a weekly pass
- Renascor Resources Limited (ASX release) · published Jan 29, 2025 · retrieved Aug 12, 2026 · archive unavailable: Wayback verification blocked by archive.org outage on 2026-08-12; recheck on a weekly pass
- Renascor Resources Limited (ASX quarterly activities report) · published Jan 30, 2026 · retrieved Aug 12, 2026 · archive unavailable: Wayback verification blocked by archive.org outage on 2026-08-12; recheck on a weekly pass