Keliber Lithium Integrated Project
Primary-source record for Keliber Lithium Integrated Project. The qualifying line is modeled at the physical grain supported by the cited source, with lithium-hard-rock-ore as input and battery-grade-lithium-hydroxide-monohydrate as output. Current state was rechecked for the Phase 2 launch-date sweep on 2026-08-18.
Location: Kokkola and Kaustinen, Central Ostrobothnia, Finland
Keliber Lithium Integrated Project qualifying line
Under construction
Integrated mine-concentrator-refinery conversion to battery-grade lithium hydroxide monohydrate
Material flow
Lithium-Bearing Hard-Rock Ore → Battery-Grade Lithium Hydroxide Monohydrate
Capacity
15,000 metric-tonne-per-year · Product mass · Nameplate · as of Dec 31, 2024
Qualification
Commercial production · The cited primary source identifies the line output as battery grade or battery quality. · Dec 31, 2024
Sources
- European Investment Bank · published Dec 31, 2024 · retrieved Aug 18, 2026 · archive