International Graphite Collie Micronising Facility
International Graphite's graphite processing hub at Collie, Western Australia: an operating pilot and qualification micronising plant that began production in February 2024 behind a A$2 million Western Australian grant, and a commercial-scale micronising facility funded in April 2024 by a further A$4.5 million from the Western Australian Government alongside A$4.7 million in Commonwealth funding under the Critical Minerals Development Program. The State also provided A$2 million for a feasibility study into a purpose-built battery anode material facility at Collie, which would take the company from mining and concentrating at Springdale near Hopetoun through to micronising and precursor material production. The commercial plant is stated at 4,000 tonnes per year initial capacity with an expansion pathway to about 7,500 tonnes per year and start-up targeted for 2027; as of the March 2026 quarter the company reported project designs complete and micronising equipment ordered but building approval from the Shire of Collie still pending, so no construction-start event is recorded. Micronising reduces particle size without purifying, and the fixed material vocabulary has no micronised-graphite token, so the line's output is recorded against natural graphite concentrate with that limitation stated on the claim.
Location: Collie, Western Australia, Australia
Pilot micronising and qualification plant
Pilot-scale graphite micronising and qualification plant producing sized graphite powders for customer testing and validation, backed by a A$2 million Western Australian grant; jet milling and classifying equipment for ultra-fine powders below 10 microns scheduled for installation with Collie Industrial Transition Fund and Investment Attraction Fund support
Material flow
Natural graphite concentrate → Natural graphite concentrate
Capacity
Qualification
Commercial-scale micronising facility (funded, not yet built)
Financed
Commercial-scale graphite micronising plant described by the company as Australia's first, comprising an 875 square metre workshop with a 730 square metre processing area in the new Collie Light Industrial Area opposite the existing IG6 facility; project designs complete and micronising equipment ordered as at March 2026, with Shire of Collie building approval pending before civils and earthworks commence
Material flow
Natural graphite concentrate → Natural graphite concentrate
Capacity
4,000 t/year · Product mass · Target · as of Apr 28, 2026
7,500 t/year · Product mass · Target · as of Apr 28, 2026
Qualification
Sources
- Government of Western Australia (Cook Labor Government media statement) · published Apr 20, 2024 · retrieved Aug 12, 2026 · archive unavailable: Wayback verification blocked by archive.org outage on 2026-08-12; recheck on a weekly pass
- International Graphite Limited (ASX quarterly activities report) · published Apr 28, 2026 · retrieved Aug 12, 2026 · archive unavailable: Wayback verification blocked by archive.org outage on 2026-08-12; recheck on a weekly pass