Hastings Yangibana Rare Earths Project

Hastings Technology Metals' Yangibana rare earths project in the Gascoyne region of Western Australia, planned as a two-stage development: Stage 1 mining and beneficiation at Yangibana producing up to 37,000 tonnes per annum of rare earth concentrate at 27% TREO, and Stage 2 a hydrometallurgical plant at Onslow producing up to 15,000 tonnes per annum of mixed rare earth carbonate (pre-separation). NAIF approved an increased loan of A$220 million in January 2023. The Stage 2 Onslow hydrometallurgical plant remains at the announced/planning stage; company timelines published earlier (first production by Q2 2025) had not been met at the time of this curation pass.

Facts on this page last re-verified Aug 11, 2026 — the oldest verification date among its current claims. How we verify.

Location: Yangibana, Gifford Creek Station, approximately 250 km northeast of Carnarvon (Stage 2 hydrometallurgical plant planned at Onslow), Western Australia, Australia

Mining & feedstock

Mining and beneficiation (Yangibana, Stage 1)

Financed

Mining of rare earth ore and beneficiation at Yangibana producing a rare earth concentrate at 27% TREO (Stage 1 of the two-stage development)

Material flow

Rare Earth Ore → Monazite Concentrate

Capacity

37,000 t/year · Product mass · Target · as of Aug 11, 2026

Qualification

No qualification claim. Status does not imply qualified output.

Mining & feedstock

Hydrometallurgical plant (Onslow, Stage 2)

Announced

Planned Stage 2 hydrometallurgical processing at Onslow converting Yangibana rare earth concentrate into a mixed rare earth carbonate (pre-separation intermediate) at 59% TREO

Material flow

Monazite Concentrate → Mixed Rare Earth Carbonate

Capacity

15,000 t/year · Product mass · Target · as of Aug 11, 2026

Qualification

No qualification claim. Status does not imply qualified output.