Cinovec Integrated Lithium Project

Primary-source record for Cinovec Integrated Lithium Project. The qualifying line is modeled at the physical grain supported by the cited source, with lithium-hard-rock-ore as input and battery-grade-lithium-carbonate as output. Current state was rechecked for the Phase 2 launch-date sweep on 2026-08-18.

Facts on this page last re-verified Aug 18, 2026 — the oldest verification date among its current claims. How we verify.

Location: Cinovec, Usti nad Labem, Czechia

Lithium chemicals

Cinovec Integrated Lithium Project qualifying line

Announced

Integrated ore beneficiation and conversion to battery-grade lithium carbonate

Material flow

Lithium-Bearing Hard-Rock Ore → Battery-Grade Lithium Carbonate

Capacity

No capacity claim. Absence of a figure means no source publishes one.

Qualification

Commercial production · The cited primary source identifies the line output as battery grade or battery quality. · Mar 25, 2025