Deposit

Kings Valley

Kings Valley is a deposit with published resource estimates in Nevada, recorded in the USGS lithium deposits in the United States selected-sites dataset (2020 release).

Facts on this page last re-verified Aug 18, 2026 — the oldest verification date among its current claims. How we verify.

Location: Nevada, United States (41.851, -118.117 approx.)

Commodities: lithium; potassium; sodium; fluorine

Deposit model: 251.30(T) - lithium in smectites of closed basins · unclassified

Geology

“Intracaldera Sedimentary Deposits—A heterogeneous sequence of mostly poorly exposed, poorly lithified, predominantly tuffaceous sedimentary deposits accumulated in a lacustrine basin in the caldera following collapse. They are preserved, and possibly were deposited, in an irregular doughnut-shaped rim or moat around the margin of the caldera. Stratigraphic relations with dated rocks indicate the sediments were deposited over a relatively long time. Through most of the caldera, the sediments overlie intracaldera McDermitt Tuff. Well-bedded, planar to cross-laminated tuffaceous sandstone, siltstone, mudstone, tephra, and minor conglomerate and fossiliferous limestone overlie the coarse deposits. These finer deposits are sparsely exposed in a few canyons and in mine and exploration workings in the northern part of the caldera, where they are locally silicified by hydrothermal alteration, but poorly exposed to commonly covered by Quaternary fan deposits elsewhere, especially around Thacker Pass in the south.” (Henry and others (2017))

Published resource estimates

As compiled by USGS USMIN from the cited studies. Resource classes follow the source; "approximate" flags values USMIN reports as approximations. These are not current company reserve statements.

MaterialClassAmountGradeContainedAs ofReference
sodium (Na)Inferred—1.1 percent—Jan 1, 2016Carew and Rossi (2016), Page 58, Table 13.1 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
lithium (Li)Proven plus Probable—3,283 parts per million—Jan 1, 2018Ehsani and others (2018), Page 102, Table 15-5 — Ehsani, R., Fourie, L., Hutson, A., Peldiak, D., Spiering, R., Young, J., and Armstrong, K., 2018, Technical report on the pre-feasibility study for the Thacker Pass project, Humboldt County, Nevada, USA, prepared for Lithium Americas Corp. [Effective date August 1, 2018]: Burnaby, British Columbia, Canada, Advisian, August 1, 238 p. [Also available at http://sedar.com]
potassium (K)Indicated—3.07 percent—Jan 1, 2016Carew and Rossi (2016), Page 58, Table 13.1 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
lithium (Li)Inferred—2,932 parts per million—Jan 1, 2018Ehsani and others (2018), Page 91, Table 14-4 — Ehsani, R., Fourie, L., Hutson, A., Peldiak, D., Spiering, R., Young, J., and Armstrong, K., 2018, Technical report on the pre-feasibility study for the Thacker Pass project, Humboldt County, Nevada, USA, prepared for Lithium Americas Corp. [Effective date August 1, 2018]: Burnaby, British Columbia, Canada, Advisian, August 1, 238 p. [Also available at http://sedar.com]
potassium (K)Measured—3.27 percent—Jan 1, 2016Carew and Rossi (2016), Page 58, Table 13.1 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
potassium (K)Inferred—3.04 percent—Jan 1, 2016Carew and Rossi (2016), Page 58, Table 13.1 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
sodium (Na)Indicated—1.04 percent—Jan 1, 2016Carew and Rossi (2016), Page 58, Table 13.1 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
lithium (Li)Unclassified—0.34 percent—Jan 1, 1985Rossi (2010), Page 28, Table 6.1 — Rossi, M.E., 2010, NI 43-101 technical report—Stage II (South Lens) resource estimate, Kings Valley project, Orovada, Humboldt County, Nevada, USA, prepared for Western Lithium USA Corporation [Effective date May 15, 2010]: Boca Raton, Florida, USA, GeoSystems International, Inc., May 15, 115 p. [Also available at http://sedar.com.]
sodium (Na)Measured—1.13 percent—Jan 1, 2016Carew and Rossi (2016), Page 58, Table 13.1 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
lithium (Li)Inferred—0.26 percent—Jan 1, 2010Carew and Rossi (2016), Page 91, Table 13.11 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
potassium (K)Inferred—3.83 percent—Jan 1, 2010Carew and Rossi (2016), Page 91, Table 13.11 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
fluorine (F)Indicated—0.57 percent—Jan 1, 2010Carew and Rossi (2016), Page 91, Table 13.11 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
fluorine (F)Inferred—0.58 percent—Jan 1, 2010Carew and Rossi (2016), Page 91, Table 13.11 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
sodium (Na)Indicated—1.55 percent—Jan 1, 2010Carew and Rossi (2016), Page 91, Table 13.11 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
lithium (Li)Unclassified—0.33 percent—Jan 1, 1985Rossi (2010), Page 28, Table 6.1 — Rossi, M.E., 2010, NI 43-101 technical report—Stage II (South Lens) resource estimate, Kings Valley project, Orovada, Humboldt County, Nevada, USA, prepared for Western Lithium USA Corporation [Effective date May 15, 2010]: Boca Raton, Florida, USA, GeoSystems International, Inc., May 15, 115 p. [Also available at http://sedar.com.]
sodium (Na)Inferred—1.43 percent—Jan 1, 2010Carew and Rossi (2016), Page 91, Table 13.11 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
potassium (K)Indicated—3.66 percent—Jan 1, 2010Carew and Rossi (2016), Page 91, Table 13.11 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
lithium (Li)Indicated—0.27 percent—Jan 1, 2010Carew and Rossi (2016), Page 91, Table 13.11 — Carew, T.J., and Rossi, M.E., 2016, Independent technical report for the Lithium Nevada project, Nevada, USA, prepared for Lithium Americas Corp. [Effective date May 31, 2016]: Vancouver, British Columbia, Canada, SRK Consulting Inc., June 2, 119 p. [Also available at http://sedar.com.]
lithium (Li)Unclassified—0.37 percent—Jan 1, 1985Rossi (2010), Page 28, Table 6.1 — Rossi, M.E., 2010, NI 43-101 technical report—Stage II (South Lens) resource estimate, Kings Valley project, Orovada, Humboldt County, Nevada, USA, prepared for Western Lithium USA Corporation [Effective date May 15, 2010]: Boca Raton, Florida, USA, GeoSystems International, Inc., May 15, 115 p. [Also available at http://sedar.com.]
lithium (Li)Unclassified—0.34 percent—Jan 1, 1985Rossi (2010), Page 28, Table 6.1 — Rossi, M.E., 2010, NI 43-101 technical report—Stage II (South Lens) resource estimate, Kings Valley project, Orovada, Humboldt County, Nevada, USA, prepared for Western Lithium USA Corporation [Effective date May 15, 2010]: Boca Raton, Florida, USA, GeoSystems International, Inc., May 15, 115 p. [Also available at http://sedar.com.]
lithium (Li)Unclassified—0.31 percent—Jan 1, 1985Rossi (2010), Page 28, Table 6.1 — Rossi, M.E., 2010, NI 43-101 technical report—Stage II (South Lens) resource estimate, Kings Valley project, Orovada, Humboldt County, Nevada, USA, prepared for Western Lithium USA Corporation [Effective date May 15, 2010]: Boca Raton, Florida, USA, GeoSystems International, Inc., May 15, 115 p. [Also available at http://sedar.com.]

Exploration and site history

Record imported from USGS USMIN ver. 4.0 (June 2019). Developments after that date appear on facility records, not here; see the methodology.

Sources